New building entry for water lines based on the new MIS membrane injection system
The recently developed membrane injection system for optimum and reliable sealing in all standard wall types is now also available as building entry for water lines. The product is suitable for universal use in both new build and renovation projects. The new MIS 90 building entry system for water pipes is a quick-installation system for all standard wall types.However the wall has been constructed, the seal is always made with the same amount of expansion material. Neither time nor money has to be spent on finishing the external sealing. There is even the option to lay micro pipes at the same time so that glass fiber applications can be incorporated at a later date with no additional effort. Thanks to the design of the system, errors during the assembly process are virtually impossible - easy - secure - leak-proof.